About Projects Resources Contact Request a Proposal
Rooftop mechanical plant room coordinated to LOD 400
Engagements

Managed BIM delivery, packaged for where you're at.

Four named engagements, each with its own scope, deliverable and guarantee. Most projects start with a ClashCheck Audit or go direct to the BuildPath Sprint — from there, Fab-Ready and Coordination Watch pick up the next problem as it appears.

Named guarantees, not quality claims

Most MEP BIM providers promise "quality" and leave it there. Every OmegaBIM engagement is scoped with a named deliverable, and the flagship BuildPath Sprint plans routing jointly before any clash check runs — with a delivered Optimization Summary and a written guarantee behind it, not just a claim.

Find your starting point.

Match your situation to the engagement built for it.

"I'm not sure how much coordination risk we actually have."

Start with a ClashCheck Audit — a scored, low-commitment read on your current model.

"I need routing planned right the first time, not just checked for clashes."

The BuildPath Sprint is the flagship engagement — built exactly for this.

"The model's coordinated — now I need it fabrication-ready."

The Fab-Ready Package takes a route-optimized model to shop drawings and spooling.

"We want standing visibility between formal engagements."

Coordination & Model Health Watch monitors your models on a fixed schedule — detection only.

"We want the same team to own the model through construction and closeout."

The Full BIM Delivery Partnership covers this, on a limited, by-conversation basis. Ask us whether it's a fit.

All four engagements.

Built from the same capabilities, every time.

The engagement changes the packaging and the guarantee. The discipline-specific work underneath — modelling, coordination, documentation — stays the same across every offer. See our capabilities →

Get Started

Not sure which engagement fits?