Record models updated to reflect what was actually installed, for a clean handover into facilities management.
We reconcile field change markups and, where available, scan data against the design model, updating it discipline by discipline until it reflects what was actually installed.
The same four-stage delivery model, applied to as-built bim.
Field change markups and RFIs reviewed against the design model.
Model updated discipline by discipline to match installed conditions.
Updated model checked against available scan or field data.
As-built model delivered with facilities-ready data and documentation.
Field change markups, RFIs and, where available, as-built scan data — the more complete the input, the more accurate the record model.
Yes — models can be delivered with the parameter data your FM/CAFM system needs, matched to your handover requirements.
Yes — reconciling as we go through close-out avoids a backlog of markups at the end of the project.