
Ten services across four disciplines, engaged on a project-by-project basis.
Consultants and contractors need different things from a BIM partner at different project stages — so the scope, LOD target and guarantee are different by design.
LOD-anchored coordination during design development — resolving systems against architectural and structural intent before documents are issued for construction. Scoped to the design stage, without a clash-free guarantee, since design coordination and construction-ready sign-off are different commitments.
See BIM Coordination →LOD 350–400 modelling with a full clash-free guarantee on the federated model, plus fabrication-ready shop drawings — built for teams taking the model straight into procurement and installation.
See LOD Modelling →MEPF modelling delivered to the LOD your project stage needs — LOD 300/350 for design-stage consultant coordination, LOD 400 for fabrication-ready contractor delivery.
Explore LOD 300/350/400 Modelling → DOCUMENTATIONFabrication-level MEP drawings produced from a coordinated LOD 400 model, detailed to what your fabrication shop needs to build from.
Explore MEP Fabrication Drawings → FABRICATIONRevit spool drawings for pipe and duct fabrication, broken down into shop-ready spools directly from the coordinated LOD 400 model.
Explore MEP Spooling → DOCUMENTATIONConstruction-ready MEP shop drawings produced directly from a coordinated, clash-free federated model — not redrawn from scratch.
Explore MEP Shop Drawings → COORDINATIONFull-service MEPF BIM coordination management from kickoff to a signed-off, clash-free federated model.
Explore BIM Coordination → COORDINATIONStructured, discipline-by-discipline clash detection run in Navisworks and Revizto to a documented resolution log.
Explore Clash Detection → MECHANICALDuctwork and mechanical equipment routed and coordinated to LOD 400 for buildable, serviceable ceiling voids.
Explore HVAC BIM → ELECTRICALCable tray, conduit and panel routing modelled and coordinated against every other MEPF trade in the ceiling void.
Explore Electrical BIM → PLUMBINGDomestic water, sanitary and storm drainage systems modelled and coordinated to LOD 400 shop-ready detail.
Explore Plumbing BIM → FIRE PROTECTIONSprinkler and suppression systems modelled and coordinated to NFPA and local code clearances, from pump room to branch line.
Explore Fire Protection BIM → CAPTUREPoint cloud to BIM model conversion for renovation, retrofit and existing-conditions MEPF work.
Explore Scan to BIM → RECORDRecord models updated to reflect what was actually installed, delivered for handover and facilities management.
Explore As-Built BIM →